Case Study
Topshop/Topman Trafford Centre
Location:
Manchester
Project duration:
28 Weeks
Project Value:
£3.5 Million
A complete strip out and re-fit of a 63,000sq.ft. retail space to include several different brands Topshop, Topman, and Miss Selfridges across 2 floors.
The project was phased to ensure continuous trading throughout the projects duration. The scope included oversized escalators, a spectacular bespoke helical staircase, and a large central feature frame on the first floor.
The entire concept was designed to maximize the height and floor area available. The design is unique to the UK and the Arcadia Group.